
Shake the adhesive well before use. Using the brush, apply a continuous and even layer of adhesive to both cleaned and dry surfaces in a longitudinal direction (apply a thinner layer at the socket end and a thicker layer at the end of the pipe). Insert the pipes and fitting all the way to the stop, making sure not to twist the bonded parts, and hold for a few seconds. The bonded parts must be inserted within 4 minutes from the start of applying the adhesive. Allow the joint to dry for 10-12 hours, then water from the filtration system can be run through the pipes. Temperatures above +25°C or a thinner layer of adhesive shorten the open working time. Store the adhesive at temperatures from 5 to 25 °C. The adhesive withstands an operating pressure of up to 16 bar.